Demo with made-up jobs and people. Buttons that save, send or ask the AI are switched off here; in the real app they run on the owner's Mac. Back to the portfolio
Reclaimed Space Crafters Next task

How we build it

Written from your own estimates and scopes of work, so a lead carpenter can see how RSC does each kind of job, step by step. It gets better with every estimate you write.

Deck / Exterior · 1 job

Usual crew: 1 general contractor, 1 helper. Example schedule: 8-10 days on site, weather permitting.. Labor averages $7,400 over about 144 crew-hours.
Jobs: 1003-BRO (open one for its printable crew brief)
1. Demolition
  • Remove old decking, rail and stairs.
2. Footings and framing
  • Set piers and frame the deck.
3. Decking and stairs
  • Install composite boards and stairs.
4. Rail and cleanup
  • Install the rail.
  • Haul debris.

Bathroom · 1 job

Usual crew: 1 general contractor, 1 tile setter. Example schedule: 12-15 days on site.. Labor averages $9,800 over about 216 crew-hours.
Jobs: 1002-CHE (open one for its printable crew brief)
1. Demolition
  • Remove tub, tile and vanity.
  • Check the subfloor.
2. Plumbing and waterproofing
  • Move the drain for the shower.
  • Install the waterproof membrane.
3. Tile
  • Set floor and wall tile.
  • Grout and seal.
4. Fixtures
  • Install vanity, faucet and shower valve trim.
  • Hang the glass door.
5. Final check
  • Test the fan and water.
  • Walk through with the client.

Kitchen · 1 job

Usual crew: 1 general contractor, 1 carpenter, 1 helper part-time. Example schedule: 4-5 weeks on site, Monday-Friday.. Labor averages $16,800 over about 450 crew-hours.
Jobs: 1001-ALV (open one for its printable crew brief)
1. Layout and ordering
  • Measure and confirm the cabinet layout.
  • Order cabinets and counters.
2. Protection and demolition
  • Protect floors and doorways.
  • Remove old cabinets and the wall.
3. Beam and framing
  • Install temporary supports.
  • Set the new beam and posts.
4. Rough electrical and plumbing
  • Move the sink line.
  • Add under-cabinet lighting circuits.
5. Cabinets and counters
  • Hang wall and base cabinets.
  • Install butcher-block counters and shelves.
6. Finish and walkthrough
  • Paint, trim and touch-up.
  • Walk through the finished kitchen with the client.

Look

Text size
Letter style
Light or dark
Highlight color
Spacing

Changes happen right away and are kept for everyone who uses the app on this computer.