Demo with made-up jobs and people. Buttons that save, send or ask the AI are switched off here; in the real app they run on the owner's Mac. Back to the portfolio
Reclaimed Space Crafters Next task
1002-CHE Sam Chen Stage 4 of 5: Do the work, get paid Call 555-0100Email Sam
  1. ✓Write the estimate
  2. ✓Send it
  3. ✓Get it signed
  4. 4Do the work, get paid
  5. 5Wrap up
Next: Waiting on payment 1002-CHE-1Nothing to press until then. $10,450 invoiced. When it arrives, the email check suggests it for approval.
Open the job

1002-CHE · Estimate and scope of work

← Back to the job · Sam Chen · 3 Example Court, Wilton, NY

Estimate total
$18,400.00
Your direct costs
$7,000.00
Materials markup
$1,600.00
Pricing check
To see your floor price, set a target margin and an overhead % (or log enough jobs and RSC expenses for it to work out by itself) on the Pricing page.
Before overhead, this estimate leaves 62% over your direct costs.
Is the labor priced right?
216 crew-hours (figured from the crew and days below) · labor $9,800.00 · $45 per crew-hour · about 11% gross margin
Labor works out to $45 per crew-hour (216 crew-hours). Below $65 a crew-hour the work doesn't pay for the crew, truck, insurance and your time. At $72 labor would be about $15,552.
Estimated gross margin is 11% (after materials, subs and crew time at $43 an hour). The goal is 30%.
Materials markup is 25%. At 43% you'd keep about a 30% margin on materials after overhead.

Scope of work 12-15 days on site.

1. Demolition
  1. Remove tub, tile and vanity.
  2. Check the subfloor.
2. Plumbing and waterproofing
  1. Move the drain for the shower.
  2. Install the waterproof membrane.
3. Tile
  1. Set floor and wall tile.
  2. Grout and seal.
4. Fixtures
  1. Install vanity, faucet and shower valve trim.
  2. Hang the glass door.
5. Final check
  1. Test the fan and water.
  2. Walk through with the client.
Want something different?

Just say it: "labor is $11,000", "add a bathroom fan", "split framing into two phases".

Edit every number and step by hand
Prices

Other items paid up front with the first payment (optional):

The rest of labor is split evenly across the phases. Materials and windows & doors are due with the first payment.

Wording and payments

Payment groups: leave empty for one payment per phase with 10% of labor up front and 10% at the end (the Whitcomb way). Or list which phases each payment covers, like 1-3; 4; 5-7: labor is split in equal shares, one with the first payment and one per group, with materials in the first. Add + dumpster to a group to bill the dump fee with it.

Phases

One step per line; numbering is automatic and runs through the whole job. To remove a phase, clear its name.

Not included, and open decisions

Payment schedule (created)

Payment IDForDueAmount
1002-CHE-1Schedule hold + all materials + 25% of laborAt acceptance of the estimate$10,450.00
1002-CHE-225% of labor: Phases 1–2Upon completion of Phases 1–2, Steps 1–4$2,450.00
1002-CHE-325% of labor: Phase 3Upon completion of Phase 3, Steps 5–6$2,450.00
1002-CHE-425% of labor: Phases 4–5 + debris / dump feeUpon completion of Phases 4–5, Steps 7–10$3,050.00

"Contract signed" creates the payments, sets the contract total, and marks the job Signed. Save your changes first. The contract is a draft, not legal advice: have a New York attorney review it before it goes to a client.

Look

Text size
Letter style
Light or dark
Highlight color
Spacing

Changes happen right away and are kept for everyone who uses the app on this computer.